Plumbing - As constructed drawings

As Constructed or As Built Drawings

Remember when completing drawings, refer to Schedule 3 of the Director's Specified List (PDF, 623.6 KB) and include all details required.

An example of a submitted stormwater As Constructing Drawing

Example of stormwater drawing

An example of a submitted underslab sewer As Constructed Drawing

Example of underslab and sewer drawing

Updated: 09 Jun 2020

This page has been produced and published by the Consumer Building and Occupational Services Division of the Department of Justice. Although every care has been taken in production, no responsibility is accepted for the accuracy, completeness, or relevance to the user's purpose of the information. Those using it for whatever purpose are advised to verify it with the relevant government department, local government body or other source and to obtain any appropriate professional advice. The Crown, its officers, employees and agents do not accept liability however arising, including liability for negligence, for any loss resulting from the use of or reliance upon the information and/or reliance on its availability at any time.